Description
An internal design review (IDR) is an opportunity for teams to present their system’s designs in detail to receive feedback and ensure their designs meet the requirements. Based on the progress presented at the IDRs, we will gauge whether we are ready to transition from Phase C to D at the end of the summer. Each team will host their own 25-minute-long IDR. All IDRs will be recorded and uploaded to YouTube for archiving. See Design Review Best Practices for guidance.
Teams are encouraged to abide by the following presentation structure to ensure consistency and to maximize the productivity of the review:
- Team Introduction: Introduce the ’s responsibility and its contributing members.
- Requirements Model: Present the model that drives the design of your team’s system.
- System Architecture: Present the diagram that depicts the architecture of your system, its components, and their internal and external interfaces. Explain how your addresses your requirements.
- Completion Criteria: Detail your team’s . This is the beginning of your case of whether you will be ready to transition from FINCH Phase C to FINCH Phase D by the end of the summer.
- Engineering Artifacts: Present 2-3 engineering artifacts (, , , etc.) that went into the design of your system architecture. This is an opportunity for members to showcase project work.
- Risk Management: Present some risks that your team considered and has managed, is managing, or will manage. Risk Management provides assurance to external stakeholders that you have anticipated and acted on potential pitfalls in your system.
- Next Steps: Detail outstanding and your next steps to complete them. Make your final case as to whether you will be ready to transition from FINCH Phase C to FINCH Phase D by the end of the summer.
- Q&A: Reserve 10 minutes for Q&A.
Please add your slides to your team’s respective section here:
Tasks
A list of sequential tasks for the project. The project is complete when all tasks are complete
- [x] Create presentation slide decks
- [x] Add new entry to the Design Reviews database
Notes
Schedule [July 6, 2024]