The items presented here are necessary to provide the team the best possible footing as they move into Phase D: Assembly, Integration, Testing of the mission. Proof of compliance with requirements shall be shown via requirement verification matrices. The language used is as described in Requirement Qualifiers.
<aside> 💡 First iteration means that the design is expected to achieve the requirements as verified through demonstration of Builds, inspection, analysis, or manufacturer guarantee, but not necessarily through testing and so is subject to change as we learn more through the assembly, integration, and testing process. That is, a minimum viable product (MVP).
</aside>