Mechanical volume allocation trades
2024-06-22 FINCH ASSEMBLY DISCUSSION
- working on getting an updated CAD
- The goal: want a full assembly (CAD) by the IDR
- two sections to FINCH: top and bottom subassembly
- 85% done
- Concern: SRS4 model might be bigger than real life.
- Mech will decide on cutout placements for Electrical
- Concern: mounting plate for the SRS4 needs to match the SRS4 model
- Right now: ADCS connectors and SRS4 connectors are on the same side, RF connectors are on the other side
- Urgent: potential miscommunication between optics and mech, 175mm height is not correct, which mech was worried about
- FLIR Tau size and mounting is very concerning.
- Concern: Optics may not be ready with their design by the end of summer
- Mech requires CAD done to finish phase C by the end of summer, which means optics needs to pick parts and constrain their design before the end of summer
- Optics suspects they won’t be able to close their design even by the end of summer