March 6, 2025
We want the lab to accommodate the following things:
The optics table requires
Chosen Location: Corner of the lab opposite to where the current IT corner is. (Looking at the whiteboard, to the left)
This location requires the shelf there to be moved. The most obvious place to move it will be to where the current IT corner is. This involves either moving the servers or procuring furniture to allow the servers to stay where they are.
proposed the Ikea Ingo. @Coby thinks that this solution is only temporary. Temporary because the IT situation does still need to be managed. The wires are a mess and the RF equipment (which are quite sensitive) should not be on the floor. The RF equipment are connected to the servers so they now enter into the discussion.
The RF Space requires