This page summarizes a course outline for introducing new (general) members to the UTAT SS Optics Team. The following calendar shows a list of topics covered at the Optics general meetings.
Some of these presentations will be prepared for future years (optical coatings, history of microscope, detector technology). Adherence to the below schedule is not guaranteed given unforeseen circumstances and the inevitable limitation on free time.
Fall 2024 | Topics covered | Reading for next week |
---|---|---|
Sept. 14 | * Onboarding General Meeting. |
The information in the tables below is not finalized. (The second semester is currently being planned).
Winter | Topics covered | Reading for next week |
---|---|---|
detector technology. Overview of SWIR options | thorlabs page | |
SNR: radiative transfer and derivation | ||
SNR: design implications | ||
Design framework for FINCH EYE |
Summer | Topics covered | Notes, Reading for next week |
---|---|---|
May 10, 2025 | UTAT Space Systems Summer Kickoff | |
May 17, 2025 | Victoria Day - No meetings | |
May 24, 2025 | UTAT SS, Subsystem Introductions | |
payload teams (optics, pay-mech, mech, thermal) meet & describe payload design from high level | ||
1 hour presentations, 1 hour ask questions to leads & decide which subsystem to commit to. | ||
Technical onboarding. | ||
May 31, 2025 | Introduction of Summer Curriculum | |
Geometric Optics Tutorial | Read Ch. 23 in Giancoli 2014 | |
June 7, 2025 | Geometric Optics Design of FINCH EYE | Read the respective Notion page |
June 14, 2025 | Onboarding project kickoff | |
Optics together w/ Pay-mech | [IS: create Notion Page w/ instructions] | |
June 21, 2025 | ZEMAX Tutorial 1: Becoming acquainted with interface, analysis and design of simple lenses (achromat objective). | Applicable ZEMAX Knowledgebase articles. |
June 28, 2025 | ZEMAX Tutorial 2: optimization of basic lenses, on example of telescope objective. | Applicable ZEMAX knowledgebase articles. |
July 5, 2025 | Presentation: History of Telescopes | |
July 12, 2025 | Laboratory Day: demonstrate camera, alignment, etc. | |
July 19, 2025 | Onboarding project check-in, potentially w/ pay-mech | |
July 26, 2025 | Presenting Onboarding Project to whole group in general + systems. | |
Optics: next steps for involvement with UTAT SS Optics. | ||
Onwards | Summer break. |