This page summarizes a course outline for introducing new (general) members to the UTAT SS Optics Team. The following calendar shows a list of topics covered at the Optics general meetings.

Some of these presentations will be prepared for future years (optical coatings, history of microscope, detector technology). Adherence to the below schedule is not guaranteed given unforeseen circumstances and the inevitable limitation on free time.

Fall 2024 Topics covered Reading for next week
Sept. 14 * Onboarding General Meeting.

The information in the tables below is not finalized. (The second semester is currently being planned).

Winter Topics covered Reading for next week
detector technology. Overview of SWIR options thorlabs page
SNR: radiative transfer and derivation
SNR: design implications
Design framework for FINCH EYE
Summer Topics covered Notes, Reading for next week
May 10, 2025 UTAT Space Systems Summer Kickoff
May 17, 2025 Victoria Day - No meetings
May 24, 2025 UTAT SS, Subsystem Introductions
payload teams (optics, pay-mech, mech, thermal) meet & describe payload design from high level
Optics presents: FINCH EYE in a (Very Large) Nutshell 1 hour presentations, 1 hour ask questions to leads & decide which subsystem to commit to.
Technical onboarding.
May 31, 2025 Introduction of Summer Curriculum
Geometric Optics Tutorial Read Ch. 23 in Giancoli 2014
June 7, 2025 Geometric Optics Design of FINCH EYE Read the respective Notion page
June 14, 2025 Onboarding project kickoff
Optics together w/ Pay-mech [IS: create Notion Page w/ instructions]
June 21, 2025 ZEMAX Tutorial 1: Becoming acquainted with interface, analysis and design of simple lenses (achromat objective). Applicable ZEMAX Knowledgebase articles.
June 28, 2025 ZEMAX Tutorial 2: optimization of basic lenses, on example of telescope objective. Applicable ZEMAX knowledgebase articles.
July 5, 2025 Presentation: History of Telescopes
July 12, 2025 Laboratory Day: demonstrate camera, alignment, etc.
July 19, 2025 Onboarding project check-in, potentially w/ pay-mech
July 26, 2025 Presenting Onboarding Project to whole group in general + systems.
Optics: next steps for involvement with UTAT SS Optics.
Onwards Summer break.