Description
The next iteration of the FINCH mechanical assembly. In order to accomodate the new payload design, we are redesigning the mounts/brackets for FINCH components and rearranging them to fit the larger payload.
Story Checklist
- [x] Reallocate FINCH volume
- [ ] Design the following FINCH structures (changed since FINCH V1)
- [x] Upper battery pack
- [ ] Lower battery pack
- [ ] Star tracker bracket
- [ ] OBC + PAY mounting
- [x] Transceiver + splitter mojnting
- [x] EPS board mounting
- [ ] Deploy switches
- [ ] Side panels
- [ ] Solar panels + patch antennas
- [ ] Radiator panel
- [ ] Rails
- [ ] Updated -z panel
- [x] GNSS receiver + Star tracker adaptor
- [ ] GNSS antenna
- [ ] Simulate following structues in launch environment
- [ ] Side panels (solar panels + patch antennas)
- [ ] OBC + PAY + splitter + transceiver
Story Timeline
Filter the timeline below to only show chapters associated with this Story
Untitled
System-Level Checklist
A list of system artifacts to review prior to marking the Story as “Complete”
- [ ] Higher-level input have been met
- [ ] Risks have been identified and are actively being managed in the
- [ ] for design decisions have been conducted and documented
- [ ] Output requirements resulting from this story have been added to the model
- [ ] Design resulting from this story is documented in
- [ ] is up-to-date