Description
The detailed design of the FINCH mechanicals has to be complete as per the CAD model phase C completion criteria. The outcome will be a completed SolidWorks assembly of FINCH.
Story Checklist
- [x] Redesign battery pack
- [ ] Mount splitter/combiner
- [x] Mount solar panels
- [x] Mount RF board
- [ ] Figure out venting holes
- [ ] Design deploy switches
Story Timeline
Untitled
Getting Started
SOLIDWORKS
System-Level Checklist
- [ ] Higher-level input have been met
- [ ] Risks have been identified and are actively being managed in the
- [ ] for design decisions have been conducted and documented
- [ ] Output requirements resulting from this story have been added to the model
- [ ] Design resulting from this story is documented in