<aside>
✨
Space to list out all the questions I need to address and create Chapters based on this
</aside>
Running Tasks
Requirem
June 22
- Reply to Kiran’s message
- Check in on Jenny and Shayana
- Requirements overhaul
- Thermal requests
- get tester batteries
- FR4 trade - populate
- Confirm as long as they're in the optimal temperature it's fine
- Review Power Budget
Possibilities |
BQ |
LTC3850 |
Enough power to supply satellite |
|
|
Not enough power to supply sat |
|
|
LTC3850
- 2 bucks that are synchronized to be 180 out of phase
- there may be issues if their duty cycles are mismatched