Initial Testing Procedure

  1. Verify system alignment and sensor readings
  2. Request Telemetry of position
  3. Command ADCS to point in specified location
  4. Manually Perturb chassis gently to rotate spacecraft on air bearing at rate of 10 deg/second around z-axis
  5. Simulates ejection of spacecraft and detumble.
  6. Check if Maximum tumbling rate exceeded

General Overview:

Testing Procedure Revised:

Setup

  1. Stabilize Module on air bearing.
  2. Verify system alignment/sensor readings